I am now accessing as a :

Government Of Assam Soil Conservation Directorate of Soil Conservation

Watershed Development Component- Prime Minister Krishi Sinchayee Yojna (WDC-PMKSY)

  • Introduction: The Soil Conservation Department, Government of Assam is implementing a Centrally Sponsered Scheme named Watershed Development Component - Pradhan Mantri Krishi Sinchayee Yojana (WDC-PMKSY),Assam funded by Department of Land Resource (DoLR), Govt. of India.

    History: Watershed development approach has evolved with passage of time gradually from initial objectives of soil & water conservation and reducing siltation of river valley projectsto the current integrated approach of managing the biological, physical, and social elements in a landscape within a watershed's boundaries. By virtue of Participatory Watershed Development Program (PWDP) adopted in 1994 and various amendments effected in the Guidelines from time to time, securing livelihoods has also emerged as an important dimension, apart from developing rainfed and degraded lands in the country. As a consequence, watershed development approach has been accepted as a model for major public investments targeting sustainable production systems for natural resources management and livelihood options.

    Investments made in watershed development programs, like Integrated Watershed Management Program (IWMP), externally funded programs, and other natural resources management programs such as Mahatma Gandhi National Rural Employment Guarantee Scheme (MGNREGS), Rashtriya Krishi Vikas Yojana (RKVY) etc. have demonstrated reasonable success. This strongly suggests the feasibility for expanded coverage of land resources development under such programs. This is critical for sustaining high growth of agriculture and allied sectors which provide support for country‟s majority of people for their livelihoods. With the growing population of the country and for meeting targets of nutritional security, agriculture production systems in particular, and ecology at large, need a focused approach.

    The rainfed regions of the country are in need of an accelerated pace of growth, comprehensive time tested interventions, benefitting people and sustaining ecology. This paradigm goes well with the recommendation of the Inter-Ministerial Committee on Doubling Farmers Income (DFI) that invites attention to the specific needs of three principal stake holders: (a)the consumers need nutrition security (b)the farmers need income security and (c) the production environment needs ecological security.

    The past experiences of watershed approach for development of land prove that watershed is an appropriate platform for converging financial resources from various programs to supplement the project funds. This will accelerate the rate of development of landwithin a short period of about three to five years. However, the implementation experiences also necessitate redesigning the treatment approach, so as to transit from current over-emphasis on engineering-centric soil & water conservation at the cost of agronomic and other biological treatments. Secondly, it needs to recognize the importance of creating farm and non-farm- based livelihood options, and enrol every member in the project area as a stake holder. Thirdly, peoples’ responsibility for resolving demands side management, as they learn to own the Project in the interest of long-term sustainability.

        The Department of Land Resources, Ministry of Rural Development has been implementing a Centrally Sponsored Scheme (CSS) ‘Integrated Watershed Management Programme’ (IWMP) since 2009-10, which was amalgamated as the Watershed Development Component of PMKSY (WDC-PMKSY) in 2015-16. The continuation of WDC-PMKSY has been allowed by Government of India on 15.12.2021 as ‘WDC-PMKSY 2.0’ for the project period of 2021-2026 with a physical target of 49.50 lakh ha and indicative Central financial outlay of Rs. 8,134 crore. The unit cost of projects has been revised upward from Rs 12,000/ha to Rs 22,000/ha for plain areas, and Rs 15,000/ha to Rs 28,000/ha for the difficult areas and LWE areas. The States/UTs have been asked to use GIS and Remote Sensing techniques for better planning of projects. The States/UTs have also been suggested to map activities from other sectors which could be taken up within the project areas for better convergence in a saturation mode. The project period has been reduced from existing 4 - 7 years to 3 - 5 years. On the recommendations of NITI Aayog, rejuvenation of Springshed has been incorporated as a new activity in the WDC-PMKSY 2.0 within the approved cost. Till date DoLR has sanctioned projects to States/UTs covering entire physical target of land under the WDC-PMKSY 2.0 and the process of release of Central grant is under way.

    The fundamental shift in approach of watershed development needs to be reflected visibly in the program planning, institution building, implementation, budgeting and monitoring & evaluation. In this context, new watershed programme (WDC-PMKSY 2.0) is envisaged to effect the following shifts:

    1. A clear transition from the current predominant practice of mechanical/ engineering treatments to more agriculture engineering measures. This implies overwhelming focus on trees, cropping systems, soil moisture conservation & management and soil organic matter.

    2. Emphasis on realizing effective use of rain water by relying more on water productivity. This involves integrated measures to enhance water percolation for storage of rainfall in the soil profile for longer periods; and supplementing of moisture deficits in crops with water that is harvested by constructing small water harvesting structures likefield bunds, trench cum bunds, contour trenches, continuous contour trenches, farm ponds, diversion weirs,embankments, percolation tanks,check dams etc.

    3. Diligent planning for crop systems diversification for risk management; enhancing productivity by adopting water use efficient crops (like nutri-cereals, pulses and oil seeds, besides dryland horticulture); and opting for crop alignment as a principle. An important initiative would include aligning crop growth phase with water availability, to provide a protective irrigation at critical stages of crop growth.

    4.Clear risk management plans for adaptation and mitigation of adverse impacts of climate variability and change; diversification of the watershed economy by adopting integrated farming systems – agronomic and horticulture crops, livestock, agro-forestry, fishery, poultry etc.; enlarging livelihood portfolios; building climate change projections into water harvesting designs; precision based use of water for managing drought spells; and timely agro-met farm advisories to deal with climate induced uncertainties. Access to technology suite that forecasts events like pest & disease, price & demand etc. would further help in risk negotiation.

    5.Economically vibrant institutions, like Farmers Producers Organization (FPO), to promote agri-business services and impart efficiency to transactions at both input and output management stages. Such organizations are to be people – owned, people – managed and people-centric approach.

    6.Setting up and nurturing of community groups that will take interventions beyond mere creation of assets and promote responsible ownership and management. Formation of User Groups based on common identities and interests around natural resources and work consciously towards integrating the principle of sharing.

    7.Focus on decentralization, flexibility, community empowerment and greater role for village-level institutions in the planning process with a view to accommodating the local social and traditional strengths.

    8.Rejuvenation of springs by taking up appropriate watershed activities in the watershed development projects.

    Implementing Agency: State Level Nodal Agency (SLNA), Assam

    Address: 3rd floor, Bhumi Sangrakshan Bhawan, R.G. Baruah Road, Guwahati-781006

    Website:https://slnaiwmpassam.gov.in/
    

    Functions of SLNA:

    1.To prepare a State Perspective and Strategic Plan (SPSP) of watershed development projects for the State /UT (if not already prepared and approved) on the basis of plans prepared at the Block and District levels. SLNA may also consider developing springs especially in hilly terrain of States / UTs. It shall then submit this along with implementation strategy, expected outcomes and financial outlays to the NLNA for appraisal and clearance.

    2.To establish and maintain a State Data Cell (SDC) from the funds sanctioned to the States / UTs, and connect it online with the NDC.

    3.To provide technical support to all the WCDC, set up at the District level.

    4.To approve DPRs. While approving DPRs, it should be ensured that relevant activities originating from GPDP documents are incorporated in the DPRs.

    5.To approve a list of independent institutions for capacity building of various stakeholders within the State /UT, and work out overall capacity building strategy in consultation with NRAA/NLNA/SLND.

    6.To arrange sanctioning of individual watershed development projects submitted by the WCDC after appraisal and recommendation of Steering Committee of NLND, keeping in mind the budgetary authorization made by the SLSC.

    7.To approve PIAs identified/selected by WCDC by adopting objective and transparent selection criteria, and establish monitoring, review, evaluation and learning systems at various levels (internal and independent external systems).

    8.To undertake regular on-line monitoring of implementation projects in the State /UT. It shall also hold review meetings at fixed intervals, besides undertaking field visits to ensure quality of implementation. Commissioning of studies, evaluations, workshops, learning meets and the like, is another important task to build a feedback loop.

    9.To constitute a State level Panel of Independent Evaluating Agencies. The evaluating agencies may be shared with the Districts to take up Mid-term and End- of- term evaluation of independent projects.

    10.To prepare State-specific Process Guidelines, and Technology Manuals etc. in coordination with the SLND.

    11.To design and obtain approval of competent authority to release, Guidelines for Establishment and Utilization of Watershed Development Fund (WDF)‟ based on model Guideline.

    Abstract of WDC-PMKSY 2.0:

       Department of Land Resources (DoLR), GoI approved WDC-PMKSY 2.0 for the State of Assam in the Steering Committee Meeting held on 4th January 2022:-

    •                                  Total nos of watershed projects sanctioned  : 29 Nos
    •                                  Total treatable area                                       : 1.28574 Lakhs hectare.
    •                                  Total project cost                                          : Rs. 293.0028 Crores.
    •                                  Total project period                                      : 3-5 years i.e. 2021-2026.

      The Government of India has sanctioned and released Rs. 16.48 Cr as 1st tranche. In the FY 2021-22 for preparatory phase work and its Matching state share Rs. 1.08 Cr. has been received. In the Financial Year    2022-23 Central Share Received Rs. 54.02 Cr and State Share Received Rs. 6.75 Cr.

     

     

    Downloads
    Watershed Development Component- Prime Minister Krishi Sinchayee Yojna (WDC-PMKSY)
    TitleSizeDetail
    Progress of WDC-PMKSY 2.0 till the month of May,2023212.22 KBswf-image